Small jobs by the day, projects by the quote
By the half day or full day
Build a punch listRepairs
Sticking doors, loose railings, holes in walls, leaking faucets, sagging gutters.
Carpentry
Shelves, built-ins, trim, stair parts, closet fit-outs.
Doors and windows
Hung, adjusted, weather-stripped, rescreened, fitted with new locks.
By fixed quote
KitchensNew cabinets and counters, or new doors on sound boxes. Tile, trim and the fiddly carpentry around appliances.2 to 5 weeks
BathroomsFull rebuilds with our regular plumber and tile setter, or a new vanity, floor and fan in a week.1 to 3 weeks
Decks and porchesBuilt to code with a permit, or repaired board by board. Steps and railings made solid.1 to 2 weeks
Sample durations for this concept.