Skip to content

Six things we paint, and how long each takes

  1. 01

    Interior walls and ceilings

    Single rooms to whole houses. Furniture moved, floors covered, two coats.

    1 to 2 days a roomPrice it
  2. 02

    Trim, doors and windows

    Sanded, caulked and brushed or sprayed. The part that makes a room look finished.

    Half a day a roomPrice it
  3. 03

    Kitchen cabinets

    Doors off and sprayed in the shop, boxes painted on site. Hardware back on straight.

    5 to 7 daysPrice it
  4. 04

    Exterior siding and trim

    Washed, scraped, primed where bare, then two coats. Lead-safe practice on older houses.

    4 to 8 daysPrice it
  5. 05

    Decks and porches

    Stripped or sanded, then stained or painted. Loose boards fixed first.

    2 to 3 daysPrice it
  6. 06

    Wallpaper removal

    Steamed off, walls washed, skimmed where the paper took the surface with it.

    1 day a roomPrice it

Sample durations for this concept, for a typical house.

A porch with blue-grey siding, a dark front door and white wicker chairs

Not sure which colour?

We paint two-foot samples on the actual wall and leave them for a few days. Colours change between morning and evening, and between the tin and the room.

Book a walk-through