What we build

Each one as a refresh, where the bones are good, or a full rebuild.

Kitchen

New cabinets, counters and lighting, or the same layout made new.

A refresh
6 weeks
A full rebuild
15 weeks
See the timeline

Bathroom

From a new vanity and floor to a room taken back to the studs.

A refresh
4 weeks
A full rebuild
8 weeks
See the timeline

Basement

A dry, warm room where there was storage.

A refresh
4 weeks
A full rebuild
13 weeks
See the timeline

Deck or porch

Rebuilt on the frame you have, or new from the footings up.

A refresh
2 weeks
A full rebuild
6 weeks
See the timeline

Sample durations for this concept, including design and ordering.

A room stripped to brick and bare joists

What we find behind the wall

Old houses hide things: knob-and-tube wiring, a joist someone notched in 1962, a drain that runs uphill. The price includes an allowance for it, and you see a photograph before a dollar of it is spent.