Renovations
Plan the plumbing before you choose the tile.
The best renovations settle the plumbing decisions early. Build a brief below, then bring it to a planning meeting.
Planning brief
Six phases, from drawings to handover.

- 01
Planning
Two to three weeks before demolition
Fixture list confirmed, valve bodies ordered, drawings marked up with heights and centerlines.
- 02
Demolition review
Day of opening
We walk the open walls with the contractor and flag anything that changes the plan.
- 03
Rough-in
Usually two to four days
Supply, drain and vent installed to the drawings, then pressure-tested.
- 04
Inspection
Before insulation
Town inspection, plus our own photo record of every wall before it closes.
- 05
Trim
After tile and stone
Fixtures installed, set and tested. Protective film stays on until you say.
- 06
Handover
Final visit
Valves demonstrated, care notes for each finish, cartridge part numbers on file.