Commercial roofing
A roof replacement is a construction project. We run it like one.
Typical sequence
Eight weeks, in plain view.
Illustrative timeline for a mid-size re-roof. Every project gets its own.
Survey
Walk the roof, core samples, drains, equipment and access.
Scope & submittals
Written scope, system data sheets, schedule and safety plan.
Mobilize
Crane day, material staging, protection of entrances and docks.
Tear-off & dry-in
Sections opened and closed the same day. Never more than we can cover.
New system
Insulation, membrane, flashings and edge metal, section by section.
Close-out
Punch list, manufacturer inspection, warranty and as-built photos.
Control
What owners and property managers get from us
Single point of contact
One project manager from bid to warranty, reachable by phone.
Daily dry-in
Every opened section is watertight before the crew leaves.
Photo log
Progress photos by roof area, shared each week.
Written safety plan
Fall protection, hoisting and public-access protection, site specific.
Tenant notices
Template notices for residents or staff before noisy work begins.
Manufacturer close-out
Inspection and warranty registration handled for you.