A roof replacement is a construction project. We run it like one.

Typical sequence

Eight weeks, in plain view.

Illustrative timeline for a mid-size re-roof. Every project gets its own.

Survey

Walk the roof, core samples, drains, equipment and access.

Scope & submittals

Written scope, system data sheets, schedule and safety plan.

Mobilize

Crane day, material staging, protection of entrances and docks.

Tear-off & dry-in

Sections opened and closed the same day. Never more than we can cover.

New system

Insulation, membrane, flashings and edge metal, section by section.

Close-out

Punch list, manufacturer inspection, warranty and as-built photos.

Control

What owners and property managers get from us

  • Single point of contact

    One project manager from bid to warranty, reachable by phone.

  • Daily dry-in

    Every opened section is watertight before the crew leaves.

  • Photo log

    Progress photos by roof area, shared each week.

  • Written safety plan

    Fall protection, hoisting and public-access protection, site specific.

  • Tenant notices

    Template notices for residents or staff before noisy work begins.

  • Manufacturer close-out

    Inspection and warranty registration handled for you.

Roofing crew working on a pitched roof